Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
Status Future consideration
Created by Guest
Created on Jan 21, 2021

Lock cable in cable drum calculation

Got a request from PPA Slovakia

It will be useful to have a lock for cable to not change in drum calculation.

The situation is maybe:

  • cables are routed and calculated in drum calculation which drum shall be used

  • now a number of cable must be changed and will be longer or shorter than calculated in a 1st routing

  • to create a new drum calculation updating with new length information, it may happen, a cable calculated in a 1st export to drum 1 will now on drum 2, but maybe the drum is already on site and can´t be changed, so a lock for cable on specific drum will be useful