## Based on our evaluation of Update 9, we have identified the following enhancement opportunities for implementation in BRCM Update 24.03 >>>
#1. Upgrade Cable/Equipment List Format:
Transition the “Cable/Equipment List” file format from .xls to .xlsx to leverage the features of the latest Excel versions. (This will require corresponding updates to the XML configuration)
#2. Streamline Equipment Import Options:
To reduce confusion between the "Equipment Import" and "ID Manager" functionalities, we propose hiding the "Equipment Import" tab from the BRCM toolbox.
#3. Introduce Progress Indicators: Implement "Please wait", "Loading", or progress graphics in areas where operations take noticeable time, including:
Cable List Import
Equipment List Import
Cable Manager: "Refresh Model"
Cable Manager: "Auto Connect"
Cable Manager: "Auto Route"
#4. Enhance Alert Information in Cable Manager: Ensure all alert indicators in Auto Connect display corresponding messages in the "INFO" column (Many times that info not fetched to "Info" column)
Red Triangle Alert: Missing connection/termination points (currently shown)
Yellow Triangle Alert: Item not found (not currently shown)
Blue Triangle Alert : New item added (not currently shown)
#5. Standardize Equipment Level Naming:
All equipment should be assigned the level "E-BRCM-EQPM-3D". This resolves issues such as the motor not appearing in the routing file due to incorrect level assignment.
#6. Improve Auto Route BRCM Info:
The Auto Route tool should accurately display the number of successful and failed routes in the BRCM info dialog. You can include a total circuit count at the bottom for clarity and info should be accurate for hits and failed. (Currently, it shows wrong info multiple times)
#7. Optimize "Refresh Model" Functionality:
Add progress indicators to clarify when the operation is in progress or complete.
Integrate "Refresh Model" with the Auto Route tool to ensure new circuits are automatically recognized, eliminating the need for mandatory manual refresh.
#8. Integrate Auto Connect with Auto Route to enhance the Auto Route tool to automatically perform Auto Connect, streamlining the routing process into a single operation.
#9. Ensure Consistent Equipment Level Assignment:
Verify that all equipment, both Imperial and Metric are assigned the correct level "E-BRCM-EQPM-3D". (If Equipment has another level, then it neither visible nor considered for Auto Routing process in design file.)
#10. Insert & Connection Points for All Equipment (Need to add that provision):
Each equipment item must have defined Insert and Connection Points in the Property window to support default sphere placement during Auto Routing.
#11. User-Controlled Sphere Placement:
Provide users with the ability to move and stretch/move the sphere directly within the design file which will offering flexibility in placement beyond the default connection point.
#12. Enhanced File Selection in Collaboration Manager:
In the path: Routing → Cable Manager → Collaboration Manager, enable users to select specific folders, subfolders and design files as that will allow locking only the files required for routing which will improving control and efficiency.
| How frequently will feature be used? | Several times a day |
| How much time will you save? | This process has the potential to save approximately 30-35 minutes per professional |
| Your Industry | Energy Infrastructure |
| Other Industry | Power |
I have to set this to "Will Not Implement" because we can't accommodate multi-enhancement ideas in a single entry. The individual requests all have different statuses and implementation schedules with some of these items already existing in newer released versions. I would recommend you review the latest released version first and then submit separate requests for each enhancement that is still needed.