For some cables it's needed to route them in dedicated cable route, which is not always the shortest one. In this case it will be very useful to use "Include raceway segment" option in Cable manager. Currently there is only "exclude" option. So to force BRCM to route some cables, I have to route them manually or exclude all other possibilities.
How frequently will feature be used? | Once a week |
How much time will you save? | A lot while working with cables implementation |
Your Industry | Energy Infrastructure |