Would like to have a different visualization in 3D cable if there is a different cable Status so that we can more easily view the phases of construction.
In the current version it´s not possible to have the Status set in the Cable Manager in the 3D cable visualization overwrite in the Options dialog.
We want to see built cable on a different level with different color than a cable released for construction.
Proposed Solution
Best will be to have a possible setting in the Options like it is possible on the raceway systems. See attached screenshot with example how it may look like.
How frequently will feature be used? | A few times a week |
How much time will you save? | Saves much time in identifying the state of each cable quickly. |
Your Industry | Other |