Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
Status Future consideration
Created by Guest
Created on Aug 8, 2023

Would like Cable Schedule to include section cuts that cables pass through

It should be possible to document the section cuts (names of the section cuts), a cable passes through on its way in a separate column.

How frequently will feature be used? Once a month or longer
How much time will you save? Will save time in having to manually document this in a report.
Your Industry Other
Other Industry All