Please can you enhance long pipe lines to enable the user to set maximum pipe lengths with specific end conditions. To enable the funcionality after placement or during placement as the becomes important when generating isometrics but maybe not at initial modelling stage.
If say BW the pipe must have a weld every say 6m or flanged, then the pipe must get divided with flanged pipe length to say 6m then gasket then another 6m. Same for coupling or union.
This would greatly enhance the accuracy of isometric and save time on flanged piping system.
| How frequently will feature be used? | Several times a day |
| How much time will you save? | Significant hours |
| Your Industry | Mining |