Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Bentley Raceway and Cable Management

Showing 97

Would like a match properties command in the Raceway Router to quickly a new raceway that matches an existing one in the drawing.

When using the Raceway Router it would be nice to select a match properties button and pick an existing raceway in the drawing to match the type, size, manufacturer, and other properties. Then use that information to insert a new piece of raceway ...
over 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

BRCM CE Auto Routing Design File, Collaboration Manager Enhancement

Hello, I am writing to address an operational challenge we have encountered while working on BRCM CE Auto Routing Design file, Specifically concerning the use of Collaboration Manager for resource design CDM files locking. Currently the Collaborat...
5 months ago in Bentley Raceway and Cable Management 0 Future consideration

Display Manager Apply without closing tool

It would be useful it we could apply Display Manager settings without closing out the tool. Currently the only way to apply the display is to select OK and close the tool box. This slows down the user if they want to toggle back and forth with dis...
8 months ago in Bentley Raceway and Cable Management 0 Future consideration

Raceway Catalog Creation

In BRCM we have a provision for “Raceway catalog Creation” and it’s a very superb tool which conserves the time but there are some points which needs to be improve and those are as follows: - It has good provision to select the template for existi...
about 1 year ago in Bentley Raceway and Cable Management 1 Future consideration

Add dimensions to 2D extraction graphics

I got multiple requests (ENEL, Iraq Oil, Grupotec) to add the dimensions (e.g. distance of conduit to side of concrete and distance between conduits) automaticaly like it work for the size of concrete.
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Add support to connect duct bank to manholes in a referenced DGN file

Currently, BRCM does not support duct bank connections to manholes that are referenced in from another Underground file. It's very common to have multiple underground files in a project, and manholes need to support connections to these duct banks...
9 months ago in Bentley Raceway and Cable Management 0 Future consideration

Avoid raceway overfill in manual routing

Would like the option of having the software check raceway fills when manually routing cables through raceway systems in the Cable Manager and alert the user if the fill will be exceeded.
11 months ago in Bentley Raceway and Cable Management 0 Future consideration

Perform raceway size calculation using all possible routed cable

It would be helpful if the software had an option to route all cables ignoring fill and then recommend a raceway size to accommodate the required number of cables.
11 months ago in Bentley Raceway and Cable Management 0 Future consideration

Would like a multiplier for routed cable lengths

Would like to be able to specify a multiplier that would affect the length calculation of routed cables. For example, specify that cables should be 110% of the length calculated with current methods. It may be necessary to do this on a per voltage...
11 months ago in Bentley Raceway and Cable Management 0 Future consideration

Would like raceway and equipment tags to support Plant Breakdown Structures like KKS

It would be helpful if raceway and equipment tags could be comprised of multiple properties like the Plant Breakdown Structure in OpenPlant to support these types of tagging conventions including KKS.
11 months ago in Bentley Raceway and Cable Management 0 Future consideration