When we are placing flow arrow note in our models, if the piece of pipe is too small, the placement of the note is note working well. Most of the time we have to stretch the pipe to a bigger dimensions, place the arrow and the stretch back the pipe to initial position. Idea would be to change flow arrow definition in order to be able to modify dimensions.
How frequently will feature be used? | Several times a day |
How much time will you save? | It will save time of stretching pipes. As we have a lot of small piece of part, it will save a lot of time. |
Your Industry | Oil & Gas |