Manhole should include Properties for Height, Width, Depth and opening information

Manhole should include Properties for Height, Width, Depth and opening information. This would be helpful so the user does not have to select BRCM Equipment Properties to bring up this information. The MicroStation properties window and Item Detai...
4 months ago in Bentley Raceway and Cable Management 0 Future consideration

Ability to allow Duct Bank Riser conduits to be moved or stretched

It would be highly beneficial for BRCM duct bank riser conduits to support stretching and adjustable spacing, allowing conduits to be moved closer together or farther apart to accommodate required installation locations. This need is especially ev...
4 months ago in Bentley Raceway and Cable Management 0 Future consideration

Equipment Import from Excel - rotation

Hello, I would like to suggest a new improvement for equipment import from an Excel spreadsheet. Beside equipment name, I would like also to define rotation axis and rotation degree. It will be very helpful e.g. while I am importing lighting fixtu...
over 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

BRCM 2024: Equipment Terminal (Target) ID Not Updating for Unopened Equipment Files During Auto Routing Import

HI, We are facing a workflow limitation in BRCM 2024 during the Auto Routing process. When importing the Cable List and Equipment List, the system updates the database and the Equipment Terminal (Target) IDs are assigned only to the equipment CAD ...
7 months ago in Bentley Raceway and Cable Management 3 Future consideration

Adding Cable Laying Method drop down to Check Routing Connectivity Tool

While using the Check Routing Connectivity Tool, it would be highly beneficial to include an option to select the Cable Laying Method alongside voltage levels as routing filter. Currently, the tool shows connectivity based solely on voltage levels...
10 months ago in Bentley Raceway and Cable Management 0 Future consideration

Improved Raceway Selection Across Entire Cable Route

Problem Statement In the current BRCM workflow, cables that belong to a circuit are typically routed through a common raceway path using the Includes option in Cable Manager. While this approach works in many cases, there are scenarios where it do...
6 months ago in Bentley Raceway and Cable Management 1 Future consideration

Raceway covers

Currently in BRCM are two settings related to covers. One is located in properties of the raceway, in UDAs as "Cover Type". It's needed to use it to include covers in BOQ. Second setting is hidden in the fitting catalogue definition per raceway ty...
over 2 years ago in Bentley Raceway and Cable Management 0 Future consideration

Raceway ID and Assignment Tool - "Export" and "Import" function

Enhance the Raceway ID and Assignment tool's functionality by incorporating the "Export" and "Import" functions, allowing for the seamless assignment of new IDs to existing segments. This streamlined ID assignment process is highly beneficial in e...
about 3 years ago in Bentley Raceway and Cable Management 2 Planned

Add Connector to each Object of Multi-Object Equipment for Cable Routing.

BRCM gives the user the ability to add multiple Object to an equipment before placement but only allow one connection point. This mean that routing of cable cannot be connected to the exact object of the multi-object equipment. An MCC for example ...
about 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

Add Manhole, Handholes, Pullboxes IDs to Cable Routing instead of Airgap

It would be extremely important to add Add Manhole, Handholes, Pullboxes IDs to Cable Routing instead of Airgap. Currently Airgap is added into the routing and this does not give design or construction team information on where the circuit should ...
11 months ago in Bentley Raceway and Cable Management 2 Future consideration