Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Bentley Raceway and Cable Management

Decouple duct bank conduit numbering from concrete geometry to enable flexible renumbering and painless additions without remodelling entire runs.

Enhancement Title Flexible Duct Bank Conduit Numbering Decoupled from Concrete Geometry Product / Platform Bentley electrical / duct bank modeling tools (e.g., BRCM / Raceway & Cable Management) Problem Statement Currently, duct bank conduit n...
4 months ago in Bentley Raceway and Cable Management 0 Future consideration

Possibility to resize right panel in Cable Manager

I would like to have a possibility to resize right panel in Cable Manager (Cable properties, Eqp. properties, Routing properties) for a better cable's overview.
over 4 years ago in Bentley Raceway and Cable Management 0 Future consideration

Concatenating the multiple User defined attributes to form separate Tag format

looking for Combined Properties Tags in BRCM, on basis of properties which can be having different kind of values, which can be selected from Picklist, drop down menu and different options
about 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Provide Include Raceway Segments option in Cable Manager

Would be helpful to allow the user to select raceway segment(s) that must be included in the routing of the selected cable. Currently the user must use the Excludes property and select all the raceway they do not want to include in the routing of ...
about 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Create 3D cable

I would like to identify 3D cables by seperate levels with same name as cable name.
over 4 years ago in Bentley Raceway and Cable Management 2 Will not implement

Edit Duct Bank Fittings

The duct bank edit tools set should include a function that enables users to Edit Raceway Fittings by selecting multiple conduits and select the new parameters. The case where we have found this would be extremely helpful is when we need to change...
10 months ago in Bentley Raceway and Cable Management 0 Future consideration

Would like some specific template and data in Cable routing Output

The available template in BRCM doesn't have required fields and units. It would be good if the report consists of how each raceway filled Based on cable types, No. of cables, Total no. of cable in sq.mm, sum of Diameter in units, Total weight in u...
10 months ago in Bentley Raceway and Cable Management 0 Future consideration

Copying equipment should automatically assign the next available ID.

When you copy equipment it should automatically rename the equipment-ID to the next possible ID to avoid creating duplicate IDs. The software could apply a default ID format to define the next available ID. This should be supported for both of the...
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Physically model Cable Tray Barriers.

Would like cable tray barriers to be modeled inside the trays so that designers and clients can see that a tray has dividers.
about 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Ability to add/ edit conduit matrix after duct bank has been modelled.

Currently adding the conduit to an existing duct bank or already modelled duct bank is not possible. In projects it is very frequent to change the duct bank matrix which after modelling the duct bank. If after modelling new conduit is required to ...
over 2 years ago in Bentley Raceway and Cable Management 2 Planned