Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

OpenPlant PID

Showing 44

Valve Reporting for Connected Different Pipelines

Hi, We have requirement of valve reporting, where valve is connected to two different pipelines. Meaning, CP1 of valve is connected to pipeline A and CP2 of valve is connected to different pipeline B. Whenever, valve report is extracted it should ...
over 1 year ago in OpenPlant PID 0 Future consideration

Option to update to Plantsight graphic only elements

There is the need to add/modify graphic elements that are not PID components (notes, details, etc.). There should be an option/command to update in Plantsight the graphics elements that are part of the P&ID without the need of a dummy change i...
about 2 years ago in OpenPlant PID 0 Future consideration

Background Automated Data Synchronization

the way synchronization works is it checks DGN vs DB and compare them.. in the process of it, the software asks the user to "Please wait...", prompts differencing dialog (which users usually ignore).. and data is not "synched" some changes by othe...
over 2 years ago in OpenPlant PID 0 Future consideration

Place assembly as a group with a report

We have the option to place an created assembly as individual components or as an complete assembly. Some customer want to create schedules/reports over placed assemblies and the referring components. Requirements Add option when inserting assembl...
over 3 years ago in OpenPlant PID 0 Future consideration