Consistency Manager Enhancements

Please consider to enhance the consistency manager to check the component sequence between the P&ID and 3D Model. As an example. The P&ID shows a manual isolation valve on a tank followed by an actuated valve followed by an instrument. In ...
about 1 month ago in OpenPlant Modeler 0 Future consideration

Annotation in OpenPlant Drawing with Callout

Please can you consider improvements to the annotation using the Notes Place Label Tool in OpenPlan when generating 2D drawings with Call Outs to hyperlinked sheets. Annotation: Currently, including custom Calculated EC Property Specifications in ...
about 1 month ago in OpenPlant Modeler 1 Needs review

Option to Create Instrument like Create Equipment

Currently we have the feasibility to create intelligent Equipment from parametric solid independently similary we should have ability to create smart instrument from custom geometry.We cannot use Class as Custom component from Piping tab because i...
about 1 year ago in OpenPlant Modeler 5 Future consideration

Ability to Check Out Pipeline or Equipment in OPM from PlantSight using key-in/Macro/VBA

Using Explorer View, PlantSIght Tab to check Pipelines and Equipment out into OPM works fine for smaller models, but when you ahve 46k Tags the process can take hours to check each individual Pipeline or Equipment out for a project. The ability to...
2 months ago in OpenPlant Modeler 0 Future consideration

Please bring back Ctrl G and Ctrl U commands

In the latest release OpenPlantModeler 10.11.00.260 the functionality to group items has been removed. These commands grouped selected items to make it easier to pick when multiple components existed in complex models. Command were executed using ...
almost 2 years ago in OpenPlant Modeler 16 Planned

Exposing OpenPlant API via VBA/Python

Bentley shall consider exposing the OpenPlant API via Python/VBA. 1. Expose the API: Bentley needs to create bridges or wrappers that allow both Python/VBA to interact with OpenPlant API functions. 2. Integrate Schemas: Ensure that the schem...
3 months ago in OpenPlant Modeler 2 Future consideration

Improved Upgrade Process

The entire process for Workspace upgrade has been a challenging in my experience. OPM is scheduled for 2 version updates every year, and with each upgrade, users are required to perform a Workspace upgrade, and verify all customization are functio...
over 1 year ago in OpenPlant Modeler 4 Planned

Ability to stretch properties dialog without adding additional columns of categories

If users want to read the pull description of piping data for fields such as DESCRIPTION or COMPONENT NAME in the properties dialog, or the modify component dialog, they try to extend the width of the dialog. However, OPM just add more categories ...
19 days ago in OpenPlant Modeler 0 Future consideration

Change Spec of Custom Piping Component

When we change the spec of a Custom Piping Component, the graphics are reset to OPM default 3D Geometry
over 1 year ago in OpenPlant Modeler 2 Future consideration

Consider renaming Openplant Move Button

It is bad practice to have two commands with the same name. Especially, while trying to train new users. Why is there an OpenPlant Move and a Microstation Move, but both buttons are labelled Move?
23 days ago in OpenPlant Modeler 0 Future consideration