Raceway covers

Currently in BRCM are two settings related to covers. One is located in properties of the raceway, in UDAs as "Cover Type". It's needed to use it to include covers in BOQ. Second setting is hidden in the fitting catalogue definition per raceway ty...
about 1 month ago in Bentley Raceway and Cable Management 0 Future consideration

Ability to add/ edit conduit matrix after duct bank has been modelled.

Currently adding the conduit to an existing duct bank or already modelled duct bank is not possible. In projects it is very frequent to change the duct bank matrix which after modelling the duct bank. If after modelling new conduit is required to ...
3 months ago in Bentley Raceway and Cable Management 1 Planned

Multiple Equipment insertion from ID Manager

Would like the ability to select multiple equipment in the ID Manager and place them one after another in the model without having to return to the ID Manager to place each one at a time. The software should cycle through the symbols in the same o...
about 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

Would like a match properties command in the Raceway Router to quickly a new raceway that matches an existing one in the drawing.

When using the Raceway Router it would be nice to select a match properties button and pick an existing raceway in the drawing to match the type, size, manufacturer, and other properties. Then use that information to insert a new piece of raceway ...
about 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

BRCM CE Auto Routing Design File, Collaboration Manager Enhancement

Hello, I am writing to address an operational challenge we have encountered while working on BRCM CE Auto Routing Design file, Specifically concerning the use of Collaboration Manager for resource design CDM files locking. Currently the Collaborat...
5 months ago in Bentley Raceway and Cable Management 0 Future consideration

Display Manager Apply without closing tool

It would be useful it we could apply Display Manager settings without closing out the tool. Currently the only way to apply the display is to select OK and close the tool box. This slows down the user if they want to toggle back and forth with dis...
8 months ago in Bentley Raceway and Cable Management 0 Future consideration

Raceway Catalog Creation

In BRCM we have a provision for “Raceway catalog Creation” and it’s a very superb tool which conserves the time but there are some points which needs to be improve and those are as follows: - It has good provision to select the template for existi...
about 1 year ago in Bentley Raceway and Cable Management 1 Future consideration

Add dimensions to 2D extraction graphics

I got multiple requests (ENEL, Iraq Oil, Grupotec) to add the dimensions (e.g. distance of conduit to side of concrete and distance between conduits) automaticaly like it work for the size of concrete.
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Convert BRCM iModels to IFC

Several users have inquired on how to get an IFC export of a BRCM model. An iTwin Service will be developed that would convert an iModel in iModelHub to IFC. Once this service is made public users will be able to take advantage of it. For notes on...
over 4 years ago in Bentley Raceway and Cable Management 0 Already exists

Add support to connect duct bank to manholes in a referenced DGN file

Currently, BRCM does not support duct bank connections to manholes that are referenced in from another Underground file. It's very common to have multiple underground files in a project, and manholes need to support connections to these duct banks...