It will be useful to show not only the size of raceway in Raceway Fill Info dialog. It shall also show the raceway type, e.g. Cable Tray, Cable Ladder, etc as additional info.
It will be useful to have the possibility to edit the EXCEL sheet number in the XLS Import dialog in the same way as it is possible to edit the Start/End row. The benefit is if you have multiple Cable lists with same column settings it will not be...
Raceway Label Tool should allow the user to specify an offset for raceway elevation
Would like the Raceway label tool to allow me to specify an offset for the elevation properties so that I can label elevations relative to any given floor height. i.e. First floor is at 3m and raceway at 5.8 will show 5.8 in elevation but user wan...
As a designer I need a way of modifying an existing raceway label on the 2D extracted raceway to include an additional property or change the label direction. Proposed Solution The user should be able to select an existing label or group of labels...
Different level in 2D Extraction showing different Voltage level
Would like to show different raceway Voltage levels in 2D Extraction file using different colors on different levels. This means adding Voltage Level as a criteria for overwrites in the BRCM Setup > Options > 2D Extraction > Level Assignm...
Briefcase BIM file should only download Process physical and functional
Currently when using PlantSight, all connection files are downloaded to the BIM file to create it. This causes the BIM file to become very large and can take hours to open Openplant modeler depending on the size of the project. The request would b...
Make Workspace and Workset Optional Like MicroStation
Not everyone wants to be forced to use the Workspace and Workset configuration. We had MicroStation change so this could be turned off for custom configurations and need to have the same for applications like OpenPlant.
Connections between ISOSHEET using PlantSight with file based
A “typical” Plantsight workflow would be that each designer is checking in all their piping and equipment each day. When it would come time to create the system iso’s, they would check out all the lines/equipment with nozzles that are part of that...