Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

Bentley Raceway and Cable Management

Showing 97

UI to set raceway PCODE

It will be good to have an UI to set PCODE settings and possible Accessories. If possible a copy paste will be useful to copy e.g. Accessories (or other entries) from one raceway fitting to others also to other catalogs.
almost 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Import Raceway ID from line in Raceway Generator

got a request from PPA Slovakia: In case there is a line (e.g. created in other CAD tools) possible to use as line to convert into raceway using the Raceway Generator it shall be possible as option to use the attached Raceway ID from this line and...
over 3 years ago in Bentley Raceway and Cable Management 5 Future consideration

Lock cable in cable drum calculation

Got a request from PPA Slovakia It will be useful to have a lock for cable to not change in drum calculation. The situation is maybe: cables are routed and calculated in drum calculation which drum shall be used now a number of cable must be chang...
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Add column with Drum info to Cable Manager

It will be useful to add a column in CM showing the Drum the cable shall be cut after the Drum Report was created.
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Interface to cable calculation tool, e.g. Siemens SIMARIS

Sometimes there is a request from users to have an analytic tool in BRCM to check the necessary cable type and size. I guess a better solution than to create a new tool in BRCM will be to check a possible interface to Siemens SIMARIS.
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Integrate BRCM with AssetWise

Would add great value to users if we could store BRCM cable and raceway data as assets in AssetWise so that users can manage them over their life cycle.
over 4 years ago in Bentley Raceway and Cable Management 0 Future consideration

Automatic Cable Routing should allow us to exclude particular raceway segments for selected cables

When the Automatic Cable Routing routine prioritizes finding the shortest path it may not choose the preferred cable routes to make installation easier. Some examples might include: Laying cables in a cable ladder is easier to install than to feed...
5 months ago in Bentley Raceway and Cable Management 0 Future consideration

Additional cable laying method related to cable size

A user like to use an additional cable laying method related to the cable size. That mean cable with a specified diameter shall be routed single layer and all cable smaller shall be routed multi layer, also the two laying methods shall be separate...
8 months ago in Bentley Raceway and Cable Management 0 Future consideration

Property Field of length for Fittings

Would like a property to be added to fittings that get populated with the length of the fitting when the part is inserted in the drawing. This will be useful in checking the overall length of a given raceway ID. The Raceway Schedule BOM report is ...
9 months ago in Bentley Raceway and Cable Management 2 Future consideration

Duct Bank Concrete Tool should allow me to save and reuse configurations

It would be nice to be able to save and reuse Duct Bank Concrete configurations so that I can quickly change the concrete settings based on commonly used configurations.
9 months ago in Bentley Raceway and Cable Management 0 Future consideration