Color Coding of Raceway Configuration Grid

It would be greatly beneficial to color code the Raceway Configuration grid in Raceway Router and Duct Bank Router to show the voltage level in the grid of the layout. This would make it much easier for user to confirm their layout is done correctly.
9 months ago in Bentley Raceway and Cable Management 1 Future consideration

Organisation configuration enhancements

Currently, OPModeler.dgnlib is saved in each Workset. The dgn.lib contains NamedExpressions and Element Templates. The location of this file cannot be changed to the Organisation level to allow for standardisation in all projects.When you edit the...
9 months ago in OpenPlant Modeler 2 Future consideration

Ability to Check Out Pipeline or Equipment in OPM from PlantSight using key-in/Macro/VBA

Using Explorer View, PlantSIght Tab to check Pipelines and Equipment out into OPM works fine for smaller models, but when you ahve 46k Tags the process can take hours to check each individual Pipeline or Equipment out for a project. The ability to...
almost 2 years ago in OpenPlant Modeler 0 Future consideration

Documentation about components - make a thoroughly guide with sketches and all fields that control dimensions

There are many, many components missing the sketches which are shown in the catalog editor when one wants to create a new component. Please update these, so all components get the documentation. Also compile them in a PDF, listed by the different ...
over 1 year ago in OpenPlant Modeler 0 Future consideration

One button for Move Label and Modify Element

Users would save considerable amount of time if the functionality of Move Label and Modify Element is combined into one button. Currently, users have to swap between two buttons constantly to clean up labels on an isometrics. A combined button wou...
about 4 years ago in OpenPlant Isometrics Manager 1 Planned

Direct .ifc export option from BRCM

Hi, there should be a direct .ifc option from BRCM so that its handy for the user to optimise the workflow by eliminating iTwin. Also the category mapping should be possible from BRCM to Revit so that cable trays, cable ladders can be mapped with ...
7 months ago in Bentley Raceway and Cable Management 1 Future consideration

To/From data in Plantsight queries should be fixed

Currently when we create line list query in Plantsight and include TO/FROM fields, it shows multiple values in both fields, there should be a way to show only start and end point of pipelines, intermediate runs shouldn't be reported in the TO/FROM...
over 3 years ago in OpenPlant PID 1 Planned

OpenPlant i.DGN Data in Navisworks

All our customers request data rich 3D Models and the ability to view OpenPlant EC data in Navisworks as this is the most common review tool used in the industry. Currently, Autodesk is using the Bentley SDK and is capable of viewing i.dgn data ho...
over 2 years ago in OpenPlant Modeler 2 Will not implement

Increase number of tray dividers

 Currently BRCM is limited to 3 dividers, and we have had requests for more to accommodate separation requirements.
over 1 year ago in Bentley Raceway and Cable Management 0 Future consideration

Report of Flange Face Coordinates on Piping Components

Need the ability to run a report on Nozzle and Flanges to report Coordinates, Orientation and other Properties (Connection Number, Type, Rating, Diameter)
over 3 years ago in OpenPlant Modeler 1 Future consideration