Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 310 of 310

Change Raceway ID in tag

It will be useful to enable the direct edit of raceway IDs in the file, e.g. using the Edit Text command as it work in the Equipment ID and to save this information to the raceways and update in the Raceway IDs dialog.
over 3 years ago in Bentley Raceway and Cable Management 0 Future consideration

Add Modify Element to Isometrics Workflow

With Modify Element you can adjust dimensions without loosing association leader line to element. Hence this is not just a MS-functionality but an important tool when post-processing isometrics and should be integrated into isometric workflow by d...
over 3 years ago in OpenPlant Isometrics Manager 0 Future consideration

Raceway covers

Currently in BRCM are two settings related to covers. One is located in properties of the raceway, in UDAs as "Cover Type". It's needed to use it to include covers in BOQ. Second setting is hidden in the fitting catalogue definition per raceway ty...
about 1 month ago in Bentley Raceway and Cable Management 0 Future consideration

Workflow Change for Logging Enhancement to Aha if Ticket is Already Reported

It would be great to check the procedural workflow for logging item to Aha if client has already reported a case to Bentley. Client has reported a case to Bentley and based on investigation of support it should be considered as enhancement. In thi...
2 months ago in OpenPlant Modeler 2 Will not implement

Ability to add/ edit conduit matrix after duct bank has been modelled.

Currently adding the conduit to an existing duct bank or already modelled duct bank is not possible. In projects it is very frequent to change the duct bank matrix which after modelling the duct bank. If after modelling new conduit is required to ...
3 months ago in Bentley Raceway and Cable Management 1 Planned

Instrument Loops associated to Pipe Run and Pipeline

Please can you add the functionality in OPPID where the Instrument Loop is associated with Pipe Run and Pipeline? At the moment if you change the Pipeline Unit the Unit is not transferred to the Instrument Loop. This can be done by manual means bu...
3 months ago in OpenPlant PID 0 Future consideration

Ability to update properties on multiple components

CS0146120 While evaluating the data on OPM Piping Components, there are times when multiple components need to be assigned Properties. For example, we may need to update a Project Code or Shipping Status for a collection of objects that are select...
3 months ago in OpenPlant Modeler 0 Future consideration

Oval Instrument Parametric bubbles - Other functions

At the moment the Oval bubbles (Place Instrument Parametric) are only available as discrete instruments. Please can you extend the oval bubbles to also include the other functions like: Computer Function Distributed Digital Distributed Analog
3 months ago in OpenPlant PID 0 Future consideration

Ability to rotate text vertically on the dim line

Currently OPIM determines what orientation the dimension text should be based on the oriental of the dim extension lines. The request would be to tell opim the all dim text would be vertical instead of it being mixed like shown in the attached image.
10 months ago in OpenPlant Isometrics Manager 1 Future consideration

Multiple Equipment insertion from ID Manager

Would like the ability to select multiple equipment in the ID Manager and place them one after another in the model without having to return to the ID Manager to place each one at a time. The software should cycle through the symbols in the same o...
about 1 year ago in Bentley Raceway and Cable Management 0 Future consideration