Organisation configuration enhancements

Currently, OPModeler.dgnlib is saved in each Workset. The dgn.lib contains NamedExpressions and Element Templates. The location of this file cannot be changed to the Organisation level to allow for standardisation in all projects.When you edit the...
about 19 hours ago in OpenPlant Modeler 2 Needs review

Spec Change Tool Improvements

When we perform a spec change, the tool changes component types, and moves flange interface points. This wastes significant time as users need to reupdate flange locations and validate if the piping layout matches the original intended design. Add...
18 days ago in OpenPlant Modeler 0 Future consideration

UI Spec Change Tool - Row Item Counter

Item Counter and Indexing: Propose the addition of item counters or row numbers to facilitate matching components between lists, improving traceability and reducing confusion during the update process.
18 days ago in OpenPlant Modeler 0 Future consideration

UI Spec Change Tool - Highlighting selected components

Spec Change Tool Dialog - Component Matching and Highlighting: The tool should automatically highlight and match corresponding components when selections are made, making it easier to identify and replace items accurately.
18 days ago in OpenPlant Modeler 0 Future consideration

Gaskets and screws should be part of the pipeline in the "Pipeline manager".

The gasket and screw are an integral part of the pipeline, so they should be located in "Pipeline manager" --> "Components". The pipeline management process is carried out from the “Pipeline Manager” module, and bolts and gaskets should be inte...
18 days ago in OpenPlant Modeler 0 Future consideration

Edit Duct Bank Fittings

The duct bank edit tools set should include a function that enables users to Edit Raceway Fittings by selecting multiple conduits and select the new parameters. The case where we have found this would be extremely helpful is when we need to change...
23 days ago in Bentley Raceway and Cable Management 0 Future consideration

Adding Cable Laying Method drop down to Check Routing Connectivity Tool

While using the Check Routing Connectivity Tool, it would be highly beneficial to include an option to select the Cable Laying Method alongside voltage levels as routing filter. Currently, the tool shows connectivity based solely on voltage levels...
about 1 month ago in Bentley Raceway and Cable Management 0 Future consideration

Would like some specific template and data in Cable routing Output

The available template in BRCM doesn't have required fields and units. It would be good if the report consists of how each raceway filled Based on cable types, No. of cables, Total no. of cable in sq.mm, sum of Diameter in units, Total weight in u...
about 1 month ago in Bentley Raceway and Cable Management 0 Future consideration

AutoPlant Object Enabler for OpenPlant

When iTwin Synchronizer converts AutoPlant model into an iModel, AutoPlant components retain their size and shape (they look the same as in AutoPlant). The only caveat is that the AutoPlant Object Enabler for AutoCad should be installed on the sys...
about 2 months ago in OpenPlant Modeler 1 Will not implement

Add Manhole, Handholes, Pullboxes IDs to Cable Routing instead of Airgap

It would be extremely important to add Add Manhole, Handholes, Pullboxes IDs to Cable Routing instead of Airgap. Currently Airgap is added into the routing and this does not give design or construction team information on where the circuit should ...
about 2 months ago in Bentley Raceway and Cable Management 2 Future consideration