Ring Manifold design in OPM

In the industry there are cases where a circular (ring shaped) header manifolds that branches equally to feed fluids to a sub system are needed. For example, a cooling water distribution system. Currently, Openplant has limited functionality to ac...
19 days ago in OpenPlant Modeler 0 Needs review

BRCM 2024 :- Raceway IDs and Segments Tool : Analyze Model

In BRCM 2024 :- While using "Raceway IDs and Segments Tool "- Once we right click on dialog box we get 5 options to use ID assignment methods. In that 'Analyze Model' method only fetched 'No Tag Items' which is not expected as it should fetch...
about 1 month ago in Bentley Raceway and Cable Management 1 Planned

Equipment Import from Excel - rotation

Hello, I would like to suggest a new improvement for equipment import from an Excel spreadsheet. Beside equipment name, I would like also to define rotation axis and rotation degree. It will be very helpful e.g. while I am importing lighting fixtu...
3 months ago in Bentley Raceway and Cable Management 0 Future consideration

Option to Create Instrument like Create Equipment

Currently we have the feasibility to create intelligent Equipment from parametric solid independently similary we should have ability to create smart instrument from custom geometry.We cannot use Class as Custom component from Piping tab because i...
over 1 year ago in OpenPlant Modeler 5 Future consideration

Please bring back Ctrl G and Ctrl U commands

In the latest release OpenPlantModeler 10.11.00.260 the functionality to group items has been removed. These commands grouped selected items to make it easier to pick when multiple components existed in complex models. Command were executed using ...
about 2 years ago in OpenPlant Modeler 17 Planned

Ability to Check Out Pipeline or Equipment in OPM from PlantSight using key-in/Macro/VBA

Using Explorer View, PlantSIght Tab to check Pipelines and Equipment out into OPM works fine for smaller models, but when you ahve 46k Tags the process can take hours to check each individual Pipeline or Equipment out for a project. The ability to...
5 months ago in OpenPlant Modeler 0 Future consideration

Improved Upgrade Process

The entire process for Workspace upgrade has been a challenging in my experience. OPM is scheduled for 2 version updates every year, and with each upgrade, users are required to perform a Workspace upgrade, and verify all customization are functio...
over 1 year ago in OpenPlant Modeler 4 Planned

Consistency Manager Enhancements

Please consider to enhance the consistency manager to check the component sequence between the P&ID and 3D Model. As an example. The P&ID shows a manual isolation valve on a tank followed by an actuated valve followed by an instrument. In ...
4 months ago in OpenPlant Modeler 0 Future consideration

Annotation in OpenPlant Drawing with Callout

Please can you consider improvements to the annotation using the Notes Place Label Tool in OpenPlan when generating 2D drawings with Call Outs to hyperlinked sheets. Annotation: Currently, including custom Calculated EC Property Specifications in ...
4 months ago in OpenPlant Modeler 2 Needs review

Enable annotation movement with the associated pipe.

Presently moving the pipeline annotation along with the pipeline itself isn't possible as it works by design
26 days ago in OpenPlant PID 0 Future consideration