Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 285

Lock cable in cable drum calculation

Got a request from PPA Slovakia It will be useful to have a lock for cable to not change in drum calculation. The situation is maybe: cables are routed and calculated in drum calculation which drum shall be used now a number of cable must be chang...
almost 4 years ago in Bentley Raceway and Cable Management 0 Future consideration

Add column with Drum info to Cable Manager

It will be useful to add a column in CM showing the Drum the cable shall be cut after the Drum Report was created.
almost 4 years ago in Bentley Raceway and Cable Management 0 Future consideration

Drawings from OPOM are disconnected from the model

When OPOM creates a ortho drawing from an OpenPlant model, it creates a dumbed down drawing of just arcs , lines and text. This is a huge disadvantage because now a user cannot annotate any properties of the objects. OPOM will never cover every au...
about 4 years ago in OpenPlant Orthographics Manager 0 Future consideration

Add Reducer type selection in AutoFitting setting of pipe placing

Now we have only CONCENTRIC_PIPE_REDUCER option for AutoFitting on pipe drawing. Users want to have option to select what class of REDUCER will be used in AutoFitting. For example he use REDUCING_PIPE_COUPLING class and want to use it in AutoFitti...
about 4 years ago in OpenPlant Modeler 0 Future consideration

Show open ends of pipe with specific symbol (blob) in 3D

This will help user to find open end visually in 3D model.
about 4 years ago in OpenPlant Modeler 0 Future consideration

UI Larger font size

There is a lot of text in each UI view, and the font size cannot be changed.
about 2 years ago in OpenPlant Project Administrator 0 Future consideration

Change existing bend radiuses of multiple selection

The user ask to change multiple bends to other bend radius, a selection or a raceway run from source to target.
about 2 years ago in Bentley Raceway and Cable Management 0 Future consideration

Option to update to Plantsight graphic only elements

There is the need to add/modify graphic elements that are not PID components (notes, details, etc.). There should be an option/command to update in Plantsight the graphics elements that are part of the P&ID without the need of a dummy change i...
over 2 years ago in OpenPlant PID 0 Future consideration

Integrate BRCM with AssetWise

Would add great value to users if we could store BRCM cable and raceway data as assets in AssetWise so that users can manage them over their life cycle.
almost 5 years ago in Bentley Raceway and Cable Management 0 Future consideration

Include consistency checker

We should have the consistency checker from openplant modeler available in brcm in order to import equipment tags directly from PID.
over 2 years ago in Bentley Raceway and Cable Management 2 Future consideration