Skip to Main Content
Need Support? Let’s guide you to the right answer or agent.
ADD A NEW IDEA

All ideas

Showing 329 of 329

Structural Improvements

OpenPlant Modeler would be even better for preliminary studies by improving structural tools to include ladders, platforms, handrails, foundations and basic coping features. This improvement could save time and additional licenses during early mod...
over 3 years ago in OpenPlant Modeler 2 Planned

Show open ends of pipe with specific symbol (blob) in 3D

This will help user to find open end visually in 3D model.
over 3 years ago in OpenPlant Modeler 0 Future consideration

Change existing bend radiuses of multiple selection

The user ask to change multiple bends to other bend radius, a selection or a raceway run from source to target.
almost 2 years ago in Bentley Raceway and Cable Management 0 Future consideration

Save last settings in AutoPlace Conduit commands

I got multiple user requests to use save the settings in the AutoPlace conduit commands to be used if the commands are restarted. Perfect will be the possibility to save different settings to use in the project.
about 2 years ago in Bentley Raceway and Cable Management 0 Planned

Option to update to Plantsight graphic only elements

There is the need to add/modify graphic elements that are not PID components (notes, details, etc.). There should be an option/command to update in Plantsight the graphics elements that are part of the P&ID without the need of a dummy change i...
about 2 years ago in OpenPlant PID 0 Future consideration

Include consistency checker

We should have the consistency checker from openplant modeler available in brcm in order to import equipment tags directly from PID.
about 2 years ago in Bentley Raceway and Cable Management 2 Future consideration

Background Automated Data Synchronization

the way synchronization works is it checks DGN vs DB and compare them.. in the process of it, the software asks the user to "Please wait...", prompts differencing dialog (which users usually ignore).. and data is not "synched" some changes by othe...
about 2 years ago in OpenPlant PID 0 Future consideration

Integrate BRCM with AssetWise

Would add great value to users if we could store BRCM cable and raceway data as assets in AssetWise so that users can manage them over their life cycle.
over 4 years ago in Bentley Raceway and Cable Management 0 Future consideration

Using OPM piping to trace point clouds instead of 3D Shapes

Please can we have tools where we can place piping automatically over point cloud data instead of using 3rd party software or other tools to draw in 3D shapes. Instead can we place specification driven pipes and fittings.
over 2 years ago in OpenPlant Modeler 0 Future consideration

Create 3D cable

I would like to identify 3D cables by seperate levels with same name as cable name.
over 2 years ago in Bentley Raceway and Cable Management 2 Will not implement